THE LINE — NEOM
NEOM · Tabuk Region · Announced 2021 · Target Paused — vertical construction deferred to beyond 2030
Developer / Owner
NEOM Company (PIF)
Project manager
Bechtel / Jacobs (delivery partners)
Consultants
Morphosis Architects, Mott MacDonald, AECOM
Location
28.05°N, 35.30°E
Cost tracker
$64bn
NEOM programme capital deployed since 2017 — not split by sub-project
$500bn
reported cost
13% of the reported cost
Originally announced NEOM programme cost; 2026–2030 construction commitments have since been cut to about $30bn.
Figures as of June 2026 · Semafor / NEOM programme review
About the project
A 170 km linear city on the Red Sea coast designed as two mirrored walls rising 500 m, with no cars, no streets and zero-carbon operation. Phase 1 focuses on the Hidden Marina module and the excavation and marine works corridor.
Project features
- 170 km linear urban spine, 200 m wide
- Zero-car, zero-street mobility with high-speed rail
- 100% renewable energy operation
- Mirrored facade over 500 m in height
- Target population of 9 million at full build-out
Tenders & awards
Hidden Marina marine works — package 3
AwardedPackage: Marine & piling
Won by: China Harbour Engineering
Value: Undisclosed